See UPS, rotary
Legacy
See exchanger, rotary heat
The capacity of the room based on the mechanical room equipment capacity. This is the sensible tonnage of the mechanical room for supporting the computer or telecommunications room heat loads
The point at which the equipment heat load in the room no longer allows the equipment to run within the specified temperature requirements of the equipment. The load capacity is influenced by many factors. The primary one is the room's theoretical capacity. Other factors, such as the layout of the room and load distribution, also influence the room load capacity
A vertical pipe in a building
Return Heat Index
See air, return
The value of the primary metric being reported for the benchmark
The amount of time from when an action is requested until the time that the request completes and is returned to the requestor
The set of benchmark rules that defines what constitutes a valid full disclosure for that benchmark. Usually these define what parts of the benchmark configuration and the system configuration(s) that need to be detailed and disclosed